News

CALL FOR PAPERS SEPTEMBER 2024

IJSAR going to launch new issue Volume 05, Issue 09, September 2024; Open Access; Peer Reviewed Journal; Fast Publication. Please feel free to contact us if you have any questions or comments send email to: editor@scienceijsar.com

IMPACT FACTOR: 6.673

Submission last date: 15th September 2024

The digitization of the implementation of the environmental and social management of projects as a strategy for improving the reliability and optimization of environmental monitoring

×

Error message

  • Notice: Trying to access array offset on value of type int in element_children() (line 6609 of /home1/sciensrd/public_html/scienceijsar.com/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6609 of /home1/sciensrd/public_html/scienceijsar.com/includes/common.inc).
  • Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home1/sciensrd/public_html/scienceijsar.com/includes/common.inc).
Author: 
TSHITALA KALULA Patrice, NDAYE KANKA Bernard, KASENGEDIA MUTUMBE Pierre, FATAKI BAZONGA Jeannot, KAYEMBE SUNGULA Jean Réne, BASOSILA LOLOFO Norbert and MUSIBONDO EYUL ANKI Dieudonné
Page No: 
445-463

This publication, the results of which are presented, analyzed and discussed in point 3 of this text, is only part of the author's research on “the reliability and optimization by digitization of the environmental monitoring of projects in DR Congo. Only environmental studies subject to prior environmental and social impact study are concerned. In his research the author has used several materials and methods, but in this excerpt, the material presented is the ESIA of Itela Avenue in Mbandaka. In an ESIA (environmental and social impact study), the part devoted to the implementation of the environmental and social aspects of the project is the ESMP (environmental and social management plan). The author has taken to take as material only environmental and social studies validated by the specialized body of the DR Congo (ACE) and international organizations deemed suitable in terms of environmental and social protection, such as the World Bank. The material “ESIA avenue Itela”, a study approved by the ACE of the DRC is also placed on the World Bank site, for all purposes such as this study. An application for environmental and social monitoring optimized through digitization has been produced. It is presented in great detail in this document. It contains data emanating from the ESMP (resulting from the ESIA) as well as suitable instruments to be completed during the monitoring of all the environmental and social aspects of the studied project. This data is placed in several menus in digitized form. To handle the application, users must be educated on how it works, in order to access certain parts, insert data, save them and / or amend them. This application thus allows use at all times by several project stakeholders who can discuss at any time.

Download PDF: